18 June 2010

Waiting

Not a lot has happened on the conservatory front since the blockwork was finished. I think I mentioned previously that the conservatory firm wanted the  blockwork in place before they took measurements to get the stuff made. The roof also caused a few problems design wise. I got a call on Monday to say that the roof design was being signed off and going to manufacturer and that work should recommence in about a week. I will believe it when I see it.

I bought two brown leather sofas in a sale about three weeks ago. They arrived today and as they can’t go into the conservatory yet (they would get wet!) I have had to put them in the dining room, which meant taking the dining table apart and storing that and the chairs in the spare bedroom.

The flooring company phoned up last week asking to lay the laminate floor I ordered from them, told them to wait a while and I would get in touch when there was something to lay the floor on.

Also bought some outdoor furniture to go on the non-existent deck, I suppose that should be okay to live outside when it arrives.

This should arrive on Monday.