On the 29. June I contacted Ashley Construction (1996) Limited, a company which used to be run by my dad and I have known (and even shared an office with at times) for over twenty years. They recommended a local Conservatory Company who they have worked with on several projects and I met with them and Ashley at my home to discuss the best way forward. A week after the meeting I had a quote from the Conservatory Company and a week after that a quote from Ashley to complete the structural and finishing works. I accepted the prices.
Some small alterations to the blockwork have been agreed to make the design work, this includes returning the full height wall along the gable elevation about 30cm to support the box gutter. The dwarf wall that abuts the house will also be extended to full height for about 30cm.
On Wednesday of this week scaffolding boards appeared on site and when I went home for lunch on Thursday, blocks were sitting in the middle of the conservatory. By Thursday evening some the existing blockwork had been toothed out and a slot in the house wall had been ground out ready to take a vertical damp course. I haven’t actually seen any workers on site though!