The Blockwork was all finished by Thursday afternoon and the Builders put in two drain gullies connected to the existing storm-water drain either side of the conservatory. The conservatory gutters will also be taking some of the water run off from the main roof, that’s why two gullies and two downspouts are required. On Friday the builders tidied the site up, they will be back next week to put in a path and will most likely be back to make some alterations to the blockwork to the high wall once the roof detail has been finalised.
I marked out the position of the steps for the decking to show the two companies I am asking to quote where the steps will be going.